Professional Profile
Senior Projects Manager and Chartered Electrical Engineer with 15+ years of international delivery experience across Saudi Arabia, UAE, the United Kingdom and India. Specialises in full-lifecycle MEP and Electrical Engineering management, spanning MV/LV power distribution, Low Current and ELV Systems, fire life safety design, and LEED sustainable building compliance.
Over a career spanning six organisations, has personally managed a cumulative scope of work exceeding SAR 300 million across more than 20 major projects, with EPC programme values on associated assignments exceeding SAR 350 million. Has led concurrent project portfolios valued at approximately SAR 137 million, directing teams of up to 35 engineers, designers and technicians alongside 20+ subcontractors and specialist suppliers simultaneously.
Uniquely combines deep technical engineering authority with boardroom-level commercial acumen: personally responsible for reviewing, negotiating and administering every major contract executed by Advanced Systems Co. Ltd. over the past decade — including FIDIC-form agreements on Almarai PPP4 (SAR 41.5M) and Novotel Madinah Hotel (SAR 39.8M). Registered with the Saudi Council of Engineers (Membership No. 250030, valid to July 2027) as a Professional Electrical Engineer.
Core Competencies
Professional Experience
Managed a live concurrent project portfolio valued at approximately SAR 137 million across hospitality, industrial, transportation, defence and commercial sectors, while leading estimation and contract negotiation for 64 additional opportunities. Personally reviewed, negotiated or prepared every company contract over this period, including FIDIC, EPC and bespoke client agreements.
- Directed multidisciplinary teams of 20–35 engineers and 20+ subcontractors across 3–5 concurrent projects, consistently achieving programme, quality, safety and commercial objectives.
- Negotiated key FIDIC contractual provisions on Almarai PPP4 (SAR 41.5M) and Novotel Madinah Hotel (SAR 39.8M), securing terms that protected ASL's commercial interests throughout execution.
- Delivered projects across their full lifecycle: design development, construction, T&C, snagging, O&M documentation, client training and defect liability — notably on Haramain HSR, Zahid Business Park, Almarai facilities and Novotel Madinah Hotel.
- Managed all MEP procurement: supplier negotiation, material scheduling and delivery coordination across active project portfolios.
- Ensured full compliance with Saudi Building Code, IEC, NFPA, SEC and project-specific standards on all projects.
Technical authority for electrical engineering across major commercial, institutional and industrial projects. Executed 7 projects and led estimation and commercial negotiation for 42 additional opportunities.
- Prepared Single Line Diagrams (SLDs), load schedules, cable sizing calculations and protection coordination studies.
- Led value-engineering exercises reducing electrical package costs by 10–15% without compromising performance or code compliance.
- Contributed to King Abdulaziz University expansion (classrooms, auditoriums, conference halls) and KAUST campus expansion across multiple buildings, delivering within live academic environments.
- Produced Dialux lighting designs and lux calculations for 8+ sports fields and indoor facilities on Al Marai Campus, Al Kharj.
- Responsible for LEED compliance on KAUST Research Park Support Facilities, ensuring all electrical and MEP works met LEED BD+C illuminance requirements, green building credits and commissioning protocols.
- Produced Dialux lighting calculations and lux verification reports for KAUST RPSF and King Salman International Convention Center.
- Managed RFI logs, daily reports and submittals for both projects; processed 50+ RFIs per project.
BIM modelling, MEP coordination, design review and documentation for large-scale international projects across the US and Europe.
- Developed Electrical and Mechanical BIM models in Autodesk Revit to LOD 300–400; led clash detection across 5–10 disciplines per project using Navisworks.
- Projects included Apple Campus 2, UCSF Medical Center, Lucile Packard Children's Hospital, Bayer Production Plant (all California, USA) and Yandex Data Center (Helsinki, Finland).
- Executed 4 projects and led estimation for 27 additional opportunities across commercial and industrial sectors, including ENOC service stations, Volvo Warehouse and Al Rawabi Dairy Factory.
- Successfully delivered 12 projects across residential and renewable energy sectors; ensured compliance with BS 7671 throughout.
- Directed and supervised Electrical Superintendents and technicians; coordinated client and vendor installation verification tests.
Project Portfolio
Ongoing Projects — Advanced Systems Co. Ltd.
| Project | Location | Scope | Value (SAR) | Period |
|---|---|---|---|---|
| AAS — 26 Villas Compound (Main GC) | Jeddah, KSA | Full MEP | 51,600,000 | 2024 – 2027 |
| Almarai Poultry Processing Plant 4 (PPP4) | Hail, KSA | LV & Low Current | 41,500,000 | 2024 – 2026 |
| Novotel Madinah Hotel | Madinah, KSA | MV & LV, Low Current | 39,800,000 | 2023 – 2026 |
| Bahra Aluminum Plant | Jeddah, KSA | Electro-Mechanical | 3,900,000 | 2024 – 2026 |
Selected Completed Projects
| Project | Location | Scope | Value (SAR) | Period |
|---|---|---|---|---|
| Silver Sands Beach Resort | Jeddah, KSA | Electrical Systems | 27,300,000 | 2019 – 2023 |
| Royal Saudi Air Defense Forces (3 sites) | Jizan / Najran / Khamis Mushait | Electrical Systems | 18,000,000 | 2021 – 2023 |
| Zahid Business Park (TAMGO, Altaaqa, Infra) | Jeddah, KSA | Electrical Systems | 17,500,000 | 2021 – 2023 |
| AAS Warehouses, Al Khomra (Main GC) | Jeddah, KSA | Full MEP | 12,800,000 | 2023 – 2024 |
| Almarai Madinah Depot 2 | Madinah, KSA | All MEP Systems | 12,000,000 | 2022 – 2023 |
| Sharbatly Fruit Cold Store & Accommodations | Riyadh, KSA | Electrical Systems | 11,391,824 | 2017 – 2020 |
| Al Hamdan & Sons Residences — Private Compound | Jeddah, KSA | All MEP Systems | 11,000,000 | 2016 – 2019 |
| Raytheon Technologies — Offices, Riyadh | Riyadh, KSA | Electrical Systems | 10,055,000 | 2019 – 2020 |
| Logipoint — Aramex BTS Facility | Jeddah, KSA | Electrical Systems | 8,500,000 | 2022 – 2023 |
| Jeddah Islamic Biennale | Jeddah, KSA | Electrical Systems | 8,000,000 | 2022 – 2023 |
| National Commercial Bank — Tier 4 Data Center | KAEC, KSA | Electrical Systems | 8,000,000 | 2018 – 2020 |
| INDRA / SAR — SRO Madinah (Haramain HSR) | Madinah, KSA | Low Current Systems | 7,500,000 | 2018 – 2019 |
| LAS Villas | Jeddah, KSA | All MEP Systems | 5,500,000 | 2021 – 2023 |
| INDRA / SAR — Operation Control Center | Jeddah, KSA | Low Current Systems | 5,100,000 | 2018 – 2019 |
| Raytheon — Al Khalidiya Compound | Jeddah, KSA | Electrical Systems | 3,465,796 | 2020 – 2021 |
| SODAMCO Weber Mortar Plant | KAEC, KSA | Electrical Systems | 3,300,000 | 2018 – 2020 |
| Jeddah Waterfront, Obhur | Jeddah, KSA | Low Current Systems | 2,506,400 | 2023 – 2024 |
| INDRA / SAR — Maintenance Base 1 | Jeddah, KSA | Low Current Systems | 2,200,000 | 2018 – 2019 |
| Qiddiya Irrigation Pump Station | Riyadh, KSA | Electrical Systems | 2,057,003 | 2023 – 2025 |
| Jeddah Corniche Circuit — Formula 1 Grand Prix | Jeddah, KSA | Low Current Systems | 2,000,000 | 2021 |
| INDRA / SAR — Platform Monitors Installation | Madinah, KSA | Low Current Systems | 1,000,000 | 2019 |
| INDRA / SAR — Maintenance Base 3 | Madinah, KSA | Low Current Systems | 600,000 | 2018 – 2019 |
This list represents a selection of projects. Additional projects across the UK, UAE and international markets are not shown.
Certifications & Professional Registration
Membership No. 250030 Valid to 1 July 2027
Accredited Professional Certified Since 2016